Montaveré Learning Module
Sample eLearning Module

TAC

Think • Assess • Communicate

A practical framework for making safer, smarter decisions on the production floor. Learn how to pause, evaluate risk, and align the team before action continues.

🧠
THINKStop and consider.
ASSESSEvaluate the risks.
💬
COMMUNICATEShare clearly. Act together.
SAFETY
QUALITY
TEAMWORK
Decision discipline
Why It Matters

Small gaps
become big problems.

Most floor problems do not begin as major failures. They start as small signals: a changed sound, missing information, a part slightly out of spec, or a handoff that was not confirmed.

Skipped question

A task moves forward before the condition is understood.

Rushed decision

A quick fix creates a new safety, quality, or operational risk.

Unclear ownership

Everyone assumes someone else has the next step.

Weak handoff

The concern is noticed, but never clearly communicated.

UNCLEAR STEP?Ask before you act.
SEE A RISK?Speak up.
TEAM ALIGNMENTStronger together.
Interaction

What TAC Means

Select each step to reveal how the method works.

Step 1

THINK

Pause before action.

Thinking creates space between reaction and action. Before you begin, stop briefly and review the task, the standard, and the current conditions.

💡

Quick Tip: A 10-second pause can prevent a 10-hour problem.

PAUSE. THINK. PROCEED.Task • Standard • Conditions
READY?Confirm before action.
Step 2

ASSESS

Evaluate the risks.

Assessment turns a concern into a controlled decision. Select the three assessment areas in the scene: safety exposure, quality standard, and operational flow.

Safety

Could someone get hurt?

Quality

Could the product fall out of spec?

Operations

Could this create downtime, delay, or waste?

Find 3 control points.
Assess the full scene.Each point is tied to a real area: the work interface, the standard, and the handoff.
Step 3

Step 3:
COMMUNICATE

Share clearly. Act together.

Choose the communication actions that close the loop.

I noticed a safety concern at Station 4.State the concern.
I will inspect and secure the area.Confirm ownership.
I will implement the fix and verify.Close the loop.
Scenario Practice

Apply TAC

You notice a machine sounds different after a changeover, and the first part is slightly out of spec. What should you do first?

Risk level: Uncontrolled

Field Memory Tool

Make TAC easy to recall.

T

Think

Pause when something changed, feels unclear, or does not match the standard.

A

Assess

Evaluate safety, quality, and operational impact before moving forward.

C

Communicate

Share the condition, align ownership, and confirm the next step.

Use TAC when:conditions change • risk increases • the standard is unclear
Do not let uncertainty move forward.Stop. Decide. Align.
Knowledge Check

Question 1

Question text

Live Score

Complete all questions to unlock the finish screen.

0%
Module Complete

TAC Complete

Think. Assess. Communicate.

Your knowledge check result will appear here.

Final Score: 0%